Refurbishment / Uncategorized

(De-)construction has started!

The first step is to remove the dropped ceiling in all of the flat so we can structurally test the wooden beams. Luckily they appear to be in good condition – we haven’t found termite damage or rotting.

Also it turns out that there are windows that have been bricked shut above the balcony doors, in the area that was previously above the dropped ceiling. We will be able to let in more light, which will be especially usefuly for the study on the mezzanine level.

Obra2-1Obra2-2Obra2-3Obra2-4Obra2-5